Project Phase |
Model LOD |
Schedule Level |
Key Value Drivers |
Tender / Bid in early design |
100 |
Level 1-2 |
Valuable if it can be done in a day. Recommend a templatized approach |
Tender / Bid in advanced design |
100 |
Level 2-3 |
Improve schedule confidence, study design variables and different construction methods |
Preconstruction |
200 |
Level 3 |
Improve schedule confidence, study design variables and different construction methods, Target Value Design and Design/Build collaboration, increase margins by optimizing labor and equipment hours, optimize sequence and resources |
Buyout |
200 |
Level 3-4 |
Optimize sequence and resources + all the above |
Construction |
200-300 |
Level 3-4 |
Optimize sequence and resources + all the above |