Project Phase |
Grouping |
Supports |
Calendars |
Quantities |
Tender / Bid in early design |
Based on major milestones, key deliverables, and by system |
Hard Logic, Constraints, Constructability, Management of traffic, safe access to work |
Based on project constraints, owner requirements, and baseline schedule (if available) |
Can use course parameters like number of floors and floor area (commercial) |
Tender / Bid in advanced design |
By division or system and Constructability |
Hard Logic, Constraints, Constructability, Management of traffic, safe access to work |
Based on project constraints, owner requirements, and baseline schedule (if available) |
Can use course parameters like number of floors and floor area (commercial) |
Preconstruction |
Based on area, levels, systems and scope packages |
Hard Logic, Constraints, Constructability, Management of traffic, safe access to work |
Based on project constraints, owner requirements, and baseline schedule (if available) |
Can use quantities by system, level and/or element |
Buyout |
Based on area, levels, systems and scope packages |
Hard Logic, Constraints, Constructability, Management of traffic, safe access to work |
Based on project constraints, owner requirements, and baseline schedule (if available) |
Can use quantities by system, level and/or element. Static durations can be used for subcontracted scope |
Construction |
Based on subcontractor coordination, field team input (pull plan) and constructability review |
Hard Logic, Constraints, Constructability, Management of traffic, safe access to work |
Based on project constraints, owner requirements, and baseline schedule (if available) |
Can use quantities by system, level and/or element. Static durations can be used for subcontracted scope |