Tutorial: Create Calendars in ALICE Pro & Core

If you are looking to create a Calendar for your ALICE projects, then you are in the right place!

Click through the player for an interactive walk-through, or scroll down for a step-by-step guide:


Create Calendar:

  1. In the Resources tab located in the upper right, go to the Calendar section.
  2. Click Create Calendar
  3. By clicking on the first date, ALICE will select the range from the selected date to infinity.
  4. Once the range is selected, click Assign to assign the required Calendar from Project Workweeks.
  5. To select a specific range, select the first date, hold the SHIFT key, select the last date, and Assign the required project workweek
  6. Enter the calendar name, and click Save to complete the process.
Was this article helpful?
0 out of 0 found this helpful