Tutorial: Material Assignment in ALICE Core

If you are looking for instructions on assigning Material to your ALICE projects, then you are in the right place!

Click through the player for an interactive walk-through, or scroll down for a step-by-step guide:


Material Assignment:

  1. In the Gantt chart, "right-click" and select "Edit Columns."
  2. Select "Material" and click "Done" to add the Material column to the Gantt chart. 
  3. Double-click on the material cell to open the assignment window.
  4. Select the required Material(s), define the amount of material needed, and click Save to complete the process.