Tutorial: How to Print a Schedule via PDF

If you are looking for instructions on how to export/print PDFs of your ALICE projects, you are in the right place!

For a more hands-on experience, navigate through the player for an interactive walk-through, or if you prefer a more detailed approach, scroll down for a step-by-step guide:

 

 

Print PDF:

  1. On the Analyze page, click Export on the upper-right side of the page
  2. From the dropdown list, select PDF File
  3. In the appeared window, choose the Paper Size and click Print Preview to process the forward
  4. In the following window, select Save as PDF or any other custom PDF printer
  5. Activate Headers and Footers, and Background Graphics settings.

  6. Click Save and select a location to save the PDF file. 
Was this article helpful?
0 out of 0 found this helpful