February 2025 Release Notes

Plan Page

Schedule development with ALICE is now smoother and faster than ever - with fewer clicks, smarter analysis tools and automated error detection.  With these improvements, you’ll spend less time fixing schedules and more time optimizing them for better project outcomes. Read on or watch the embedded video for details.

Video Overview

Navigation improvements for faster scheduling:

  • Keyboard shortcuts - navigate the schedule using arrows and enter button
  • Easier copy/pasting and drag and drop of tasks or WBS levels
  • Calendars and UDFs (custom properties) can be assigned/reassigned to tasks in bulk.

Task relationship improvements for more visibility:

  • On the task card that appears when a task is selected, both predecessors and successors are shown. WBS is shown if you hover over the task ID. If multiple relationships exist, critical relationships are shown first.
  • Edit Successor and Edit Predecessor buttons have been added to the task card so that users can edit logic from within the task card.
  • Batch logic review and removal - if multiple tasks are selected, ALICE will show all logic ties associated with those tasks. User can remove contained logic (logic that exists between selected tasks) and/or uncontained  logic (logic incoming from outgoing from selected tasks)

Logic Loop Detection Improvements for fewer errors:

Was this article helpful?
0 out of 0 found this helpful