It’s important to have the cranes when and where you need them onsite. ALICE can help you do just that by showing you how to manage your cranes more effectively throughout the building process.
ALICE comes pre-loaded by default with a mobile crane with the following specs:
Radius (feet) |
Move time (hours) |
Qty available (number) |
$/ hr |
30 |
0 |
1 |
100 |
To complete the setup for your mobile crane, you simply specify the crane locations in the 3D viewer - make sure all desired elements are accessible (highlighted) - and assign it to the desired tasks.
ALICE will optimize your schedule by minimizing the crane’s onsite movement.
Comments
0 comments
Please sign in to leave a comment.