This is a tutorial on how to prepare and import a recipe matrix Excel file into the ALICE interface.
After watching this video, the user will have a basic understanding of how to prepare the Excel file and how to import and control the recipes and resources in ALICE.
Excel Recipe Matrix templates can be downloaded HERE
In this tutorial, we review these features of the Recipe Matrix Import tool. We will discuss the following:
- Import Options
- Construction Phases (Construction, Temporary, Demolition)
- Import multiple types of Equipment, Cranes, and Production Rates.
The original video can be found here:
Further Resources
- Recipes
- Recipes: How to Work with the Recipe Matrix
- Recipes: Temporary and Demolition Recipes
- Recipe Fundamentals
- Recipes: Export Recipe Matrix
- Recipes: Custom Precedence Types
Comments
0 comments
Please sign in to leave a comment.