This is a tutorial on how to prepare and import a recipe matrix excel file into the ALICE interface.
After watching this video, the user will have a basic understanding of how to prepare the excel file, how to import and control the recipes and resources in ALICE.
The newest Recipe Matrix template can be downloaded HERE.
In June 2020 we made some key updates to improve the user experience when importing Recipes into ALICE from an excel file.
In this tutorial, we review these features of the Recipe Matrix Import tool. We will discuss:
- New Import Options
- Construction Phases (Construction, Temporary, Demolition)
- Import multiple types of Equipment, Cranes and Production Rates
The original video can be found here:
Further Resources
- Recipes
- Recipes: How to Work with the Recipe Matrix
- Recipes: Temporary and Demolition Recipes
- Recipe Fundamentals
- Recipes: Export Recipe Matrix
- Recipes: Custom Precedence Types
Comments
0 comments
Please sign in to leave a comment.