Adjacency Constraint allows you to specify when certain elements cannot be built, unless an adjacent element that the former can connect to, has already been completed. This can apply to tunneling, bridges, and complex roof systems.
To use Adjacency Constraint:
- Select required elements and active Adjacency Constraint feature
- Use the
to connect dots
- Control the dot size by Point and Line size
- Use the
sign to add/remove start point
- Click on Adjacency Constraint feature again to finish the process
Fore more instructions and use-cases watch the video below: